Stolthaven Terminals, Dagenham


Stolthaven Terminals, Dagenham

Contract Value: £1.6 million

Design Standard: NFPA


Nu-Form Fire UK were awarded this special risk project in mid-2016 with completion in mid-2017.  The task was to protect large tanks which were to store chemicals and fuels from the inside and the outside.

Scope of works included water supplies, foam proportioning skid, tank foam pourers, deluge systems and tank cooling rings.  This was all controlled by bespoke PLC control panels.